Ore:Gold
Capacity:1200 t/d
1200 t/d gold mineral processing plant is suitable for medium-scale gold mining. Combining grinding, leaching, adsorption, and electrolysis processes, it achieves high gold recovery rate from complex gold ores. Reliable operation and easy automation.
Introduction: Shunzhi Mining undertook the customer's 1,500 tpd copper-lead-zinc, gold-silver polymetallic ore project in South Africa. Since the cooperation on the project was very pleasant and the project design overall met expectations. Therefore, the customer of this project once again chose to cooperate with Shunzhi Mining during the preparation stage of the new project to help it complete the construction of the 1,200 tpd gold ore cyanide concentrator project.
Cyanide Leaching System
The raw ore flotation tailings slurry is pumped to the pre-leaching thickener. After being concentrated to a concentration of 40%, it enters the cyanide leaching system for leaching and adsorption operations to obtain qualified gold-loaded carbon.
Desorption Electrolysis System
Send qualified gold-loaded carbon into the desorption electrolysis system. Under high temperature and high pressure conditions, anions that are easily adsorbed by activated carbon are added to the desorption system to replace Au(CN)2-.
Smelting System
After pickling and impurity removal, gold mud can be obtained, which can be directly smelted to obtain gold ingots.
Diameter: 900-4500 mm
Power: 18.5-2300 kW
Capacity: 900-4500 mm
Diameter: 900-3600 mm
Power: 15-1250 kW
Capacity: 0.25-200 t/h
Diameter: 300-3000 mm
Power: 2.2*1-30*2 kW
Capacity: 10-1783 t/d
Diameter: 30-280 mm
Classification Size: 25-130 μm
Capacity: 10-524 m³/h
Diameter: 400-1050 mm
Power: 5.5-55 kW
Capacity: 0.2-38 m³/h
Feed Size: 0-10 mm
Power: 1.5-7.5 kW
Capacity: 1.5-25 t/h